Mathew M. Gunshor



Download Rich Text Format

Results: Found 262 records (displaying records 76 through 100)


76. Schmit, Timothy J.; Gurka, J.; Gunshor, M.; Menzel, P. and Phillips, J. The history and evolution of the ABI (Advanced Baseline Imager) on the GOES-R series. History Symposium, 11th, Austin, TX, 6-10 January 2013. American Meteorological Society, Boston, MA, 2013, Abstract 1.2.
77. Schmit, Timothy J.; Goodman, Steve; Gunshor, Mat; Linsey, Dan; Rabin, Bob; Lindstrom, Scott; Bachmeier, Scott and Velden, Chris. The ABI (Advanced Baseline Imager) on GOES-R. NOAA 2013 Satellite Conference for Direct Readout, GOES/POES, and GOES-R/JPSS Users, College Park, MD, 8-12 April 2013. NASA, Goddard Space Flight Center, GOES-R Program Office, Greenbelt, MD, 2013, PowerPoint presentation.
78. Schmit, Timothy J.; Gunshor, M.; Bah, K.; Gurka, J. and Otkin, J. A. Preparing for the Advanced Baseline Imager on the GOES-R series. Annual Symposium on Future Operational Environmental Satellite Systems, 9th, Austin, TX, 6-10 January 2013. American Meteorological Society, Boston, MA, 2013, Abstract 2.1.
79. Yu, Fangfang; Wu, Xiangqizn; Lindstrom, Scott; Gunshor, Mat and Goldberg, Mitch. Analysis of GOES imager infrared radiometric calibration accuracy toward long-term climate data record. NOAA 2013 Satellite Conference for Direct Readout, GOES/POES, and GOES-R/JPSS Users, College Park, MD, 8-12 April 2013. NASA, Goddard Space Flight Center, GOES-R Program Office, Greenbelt, MD, 2013, poster presentation.
80. Gunshor, Mat; Zhang, Hong; Huang, Allen; Schiffer, Eva; Straka, William; Garcia, Ray; Martin, Graeme; Daniels, Jaime; Goldberg, Mitch and Mehta, Ajay. GRAFIIR and JAFIIR (GOES-R/JPSS Analysis Facility for Instrument Impacts on Requirements) efficient end-to-end semi-automated algorithm performance analysis and implementation verification systems. NOAA 2013 Satellite Conference for Direct Readout, GOES/POES, and GOES-R/JPSS Users, College Park, MD, 8-12 April 2013. NASA, Goddard Space Flight Center, GOES-R Program Office, Greenbelt, MD, 2013, poster presentation.
81. Bah, Kaba; Schmit, Timothy J.; Gunshor, Mat; Pierce, Brad; Greenwald, Tom; Feltz, Joleen; Rogel, Marek; Lenzen, Allen; Schaack, Todd and Nelson, Jim. Using McIDAS-V to visualize and validate real time simulated WRF-CHEM data sets for GOES-R ABI bands and products. McIDAS Users' Group Meeting, Madison, WI, 9-12 September 2013. 2013 MUG Meeting. University of Wisconsin-Madison, Space Science and Engineering Center, Madison, WI, 2013, PowerPoint presentation.
PDF Document Link to PDF
82. Schmit, Timothy J.; Wade, Gary S.; Li, Jun; Nelson, James P. III; Schreiner, Anthony J.; Li, Zhenglong; Gunshor, Mathew M. and Robaidek, Jerrold. GOES @ 60 West - a Wisconsin perspective. NOAA 2013 Satellite Conference for Direct Readout, GOES/POES, and GOES-R/JPSS Users, College Park, MD, 8-12 April 2013. NASA, Goddard Space Flight Center, GOES-R Program Office, Greenbelt, MD, 2013, poster presentation.
83. Schmit, Timothy J.; Goodman, Steve; Gunshor, Mat; Lindsey, Dan; Robin, Bob; Lindstrom, Scott; Bachmeier, Scott and Velden, Chris. Preparing for the GOES-R by using GOES-14 1-min imagery. McIDAS Users' Group Meeting, Madison, WI, 9-12 September 2013. 2013 MUG Meeting. University of Wisconsin-Madison, Space Science and Engineering Center, Madison, WI, 2013, PowerPoint presentation.
PDF Document Link to PDF
84. Feltz, Joleen; Gunshor, Mat; Schmit, Tim and Whittaker, Tom. Using McIDAS-V libraries for data analysis and visualization. McIDAS Users' Group Meeting, Madison, WI, 9-12 September 2013. 2013 MUG Meeting. University of Wisconsin-Madison, Space Science and Engineering Center, Madison, WI, 2013, PowerPoint presentation.
PDF Document Link to PDF
85. Gunshor, Mat; Zhang, Hong; Huang, Allen and Schiffer, Eva. JAFIIR (JPSS Analysis Facility for Instrument Impacts on Requirements): Efficient end-to-end semi-automated algorithm performance analysis and implementation verification system making use of CSPP. CSPP/IMAPP Users' Group Meeting, Madison, WI, University of Wisconsin-Madison, 21-23 May 2013. University of Wisconsin-Madison, Space Science and Engineering Center, Madison, WI, 2013, poster presentation. 1p,
PDF Document Link to PDF
86. Tobin, E.; Revercomb, H.; Knuteson, R.; Deslover, D.; Taylor, J.; Gorg, L.; Martin, G.; Garcia, R.; Quinn, G.; Weisz, E.; Smith, W. and Gunshor, M. Cross-track Infrared Sounder (CrIS) spectral radiance calibration and evaluations. IRS 2012: International Radiation Symposium, Berlin, Germany, 6-10 August 2012. Radiation Processes in the Atmosphere and Ocean (IRS2012). American Institute of Physics, Melville, NY, 2013, pp.724-727. Reprint # 7144.
87. Bah, Kaba; Schmit, Timothy J.; Gunshor, Mat; Pierce, Brad; Greenwald, Tom; Feltz, Joleen; Rogel, Marek; Lenzen, Allen; Schaack, Todd and Nelson, Jim. Using McIDAS-V to visualize and validate real time simulated WRF-CHEM data sets for GOES-R ABI bands and products. McIDAS Users' Group Meeting, Madison, WI, 9-12 September 2013. 2013 MUG Meeting. University of Wisconsin-Madison, Space Science and Engineering Center, Madison, WI, 2013, PowerPoint presentation.
PDF Document Link to PDF
88. Schmit, Timothy J.; Goodman, Steve; Gunshor, Mat; Lindsey, Dan; Robin, Bob; Lindstrom, Scott; Bachmeier, Scott and Velden, Chris. Preparing for the GOES-R by using GOES-14 1-min imagery. McIDAS Users' Group Meeting, Madison, WI, 9-12 September 2013. 2013 MUG Meeting. University of Wisconsin-Madison, Space Science and Engineering Center, Madison, WI, 2013, PowerPoint presentation.
PDF Document Link to PDF
89. Feltz, Joleen; Gunshor, Mat; Schmit, Tim and Whittaker, Tom. Using McIDAS-V libraries for data analysis and visualization. McIDAS Users' Group Meeting, Madison, WI, 9-12 September 2013. 2013 MUG Meeting. University of Wisconsin-Madison, Space Science and Engineering Center, Madison, WI, 2013, PowerPoint presentation.
PDF Document Link to PDF
90. Schmit, Timothy J.; Gurka, J.; Gunshor, M.; Menzel, P. and Phillips, J. The history and evolution of the ABI (Advanced Baseline Imager) on the GOES-R series. History Symposium, 11th, Austin, TX, 6-10 January 2013. American Meteorological Society, Boston, MA, 2013, Abstract 1.2.
91. Gunshor, Mat; Zhang, Hong; Huang, Allen and Schiffer, Eva. JAFIIR (JPSS Analysis Facility for Instrument Impacts on Requirements): Efficient end-to-end semi-automated algorithm performance analysis and implementation verification system making use of CSPP. CSPP/IMAPP Users' Group Meeting, Madison, WI, University of Wisconsin-Madison, 21-23 May 2013. University of Wisconsin-Madison, Space Science and Engineering Center, Madison, WI, 2013, poster presentation. 1p,
PDF Document Link to PDF
92. Schmit, Timothy J.; Goodman, Steve; Gunshor, Mat; Linsey, Dan; Rabin, Bob; Lindstrom, Scott; Bachmeier, Scott and Velden, Chris. The ABI (Advanced Baseline Imager) on GOES-R. NOAA 2013 Satellite Conference for Direct Readout, GOES/POES, and GOES-R/JPSS Users, College Park, MD, 8-12 April 2013. NASA, Goddard Space Flight Center, GOES-R Program Office, Greenbelt, MD, 2013, PowerPoint presentation.
93. Schmit, Tim; Rink, Tom; Gunshor, Mat; Bah, Kada; Wolf, Walter; Strake, William and Zhang, Wendy. Cloud and moisture imagery. 2012 NOAA Satellite Science Week, Kansas City, MO, 30 April-4 May 2012. US Department of Commerce, National Oceanic And Atmospheric Administration (NOAA), 2012, PowerPoint presentation.
94. Schmit, Timothy J.; Gunshor, Mathew M.; Bah, Kaba; Gurka, James J. and Otkin, Jason. Operational uses of the ABI (Advanced Baseline Imager) on the GOES-R series. National Weather Association annual meeting, 37th, Madison, WI, 6-11 October 2012. National Weather Association, Raleigh, NC, 2012, Abstract A2.2.
95. Gunshor, Mathew; Schmit, Timothy J.; Otkin, Jason and Bah, Kaba. The new and improved imager on GOES-R. AGU Fall Meeting, San Francisco, CA, 3-7 December 2012. American Geophysical Union, Washington, DC, 2012, Abstract IN41B-1484.
96. Zhang, Hong; Gunshor, M.; Straka, W.; Martin, G.; Wanzong, S.; Schiffer, E.; Garcia, R. and Huang, A. GRAFIIR - An efficient end-to-end semi automated GOES-R ABI algorithm performance analysis and implementation verification system. Annual Symposium on Future Operational Environmental Satellite Systems, 8th, New Orleans, LA, 22-26 January 2012. American Meteorological Society, Boston, MA, 2012, Abstract 314.
97. Schmit, Timothy J.; Gurka, J.; Gunshor, M. and Bah, K. The ABI (Advanced Baseline Imager) on the GOES-R series. Annual Symposium on Future Operational Environmental Satellite Systems, 8th, New Orleans, LA, 22-26 January 2012. American Meteorological Society, Boston, MA, 2012, Abstract 2.4.
98. Schmit, Timothy J.; Gunshor, Mathew M.; Bah, Kaba; Gurka, James J. and Otkin, Jason. Operational uses of the ABI (Advanced Baseline Imager) on the GOES-R series. National Weather Association annual meeting, 37th, Madison, WI, 6-11 October 2012. National Weather Association, Raleigh, NC, 2012, Abstract A2.2.
99. Lindsey, Daniel T.; Schmit, T. J.; MacKenzie, W. M. Jr.; Grasso, L.; Gunshor, M. and Jewett, C. P. The 10.35 micrometer band: A more appropriate window band for GOES-R ABI than 11.2?. Annual Symposium on Future Operational Environmental Satellite Systems, 8th, New Orleans, LA, 22-26 January 2012. American Meteorological Society, Boston, MA, 2012, Abstract 6.5.
100. Gunshor, Mathew; Schmit, Timothy J.; Otkin, Jason and Bah, Kaba. The new and improved imager on GOES-R. AGU Fall Meeting, San Francisco, CA, 3-7 December 2012. American Geophysical Union, Washington, DC, 2012, Abstract IN41B-1484.